
section


Front Elevation – Amphitheatre

Longitudinal profiles of the Underground Gallery – Drawing of input power supply in the Open Air Auditorium

Water fountains and Garden benches – Plants, Elevations and Cuts

Main Entrance to the Headquarters – Flower Boxes – detail

Proposal for the paving next to the building of the gardeners’ facilities

Flowerbeds

Lake – Implantation Blueprint

Personnel Entry – B-B’ Section and Stairs

Frame Plans – Sections 1.1 and 2.2

Interim Pavilion’s Garden – Section

Provisional Solution C – Modelling / Deployment
Post navigation
- 1
- 2
- 3
- 4
- Next Page »