Provisional Solution C – Modelling / Deployment

An analysis of the different stages of the park’s design process [i] reveals that the initial pathway proposed, especially in the South Zone of the park, is similar to the Santa Gertrudes Park pathway system, using many of the same routes.

A further study of pathways took place in 1968 [ii], at a late stage in the process. On 10 September, 1969, it was completed.

[i]    General Plan – Expansion

[ii]   Definitive Solution A – Modelling/Implementation

Definitive General Plan with level curves

Definitive General Plan with level curves

General Plan – Entrance

Topographic plan of the North east boundaries of Gulbenkian Park

Definitive General Plan I – 1969

Definitive General Plan II – 1969

 

  • Production date: 22/08/1968
  • Designers (main authors): TELLES, Gonçalo Pereira Ribeiro
  • Contributors (co-authors): FCG – Serviço de Projectos e Obras
  • Project phase: Do projeto de execução à obra (1963-1969)