Irrigation Plan – Construction Details – Parking Lot Coverage
Irrigation system based on the plan developed in 1965, updated due to changes that occurred during the process.
- Production date: 23/03/1967
- Designers (main authors): BARRETO, António Facco Viana, TELLES, Gonçalo Pereira Ribeiro
- Contributors (co-authors): FCG – Serviço de Projectos e Obras
- Project phase: Do projeto de execução à obra (1963-1969)
- Identifier: PT FCG FCG:SCT-S006-DES01106
- Temporal coverage: 1967
- Type of data: Image
- Extension format: 1 desenho
- Media format: jpg
- Materials: asbestos cement, concrete, gravel, medium land, peat, sarrisca, sprinkler, stone, stone slab
- Keywords: inert coating, irrigation system, living coating, roof, section, system, technical design