Location of the Headquarters and Museum – Preliminary Draft of terrain of Vilalva Park – Scale 1:1000
Volume study of the building for the three tested hypotheses for the Santa Gertrudes Park [i].
Draft included in the Memorandum, signed by Guimarães Lobato, where three options of the five previously suggested, are selected for the installation of the headquarters and museum of the Calouste Gulbenkian Foundation. The former Matadouro lot, next to Avenida Fontes Pereira de Melo and the terrain of Amoreiras, are other options.
- Production date: 13/01/1957
- Designers (main authors): FCG – Serviço de Projectos e Obras
- Project phase: A preparação do parque e as instalações provisórias
- Temporal coverage: 1957
- Type of data: Image
- Extension format: 1 desenho
- Media format: jpg
- Keywords: framing, limit, section, technical design