Lake: Construction of the rocky banks
The construction to finish part of the perimeter of the lake.by submerged loose stone walls created a box that allowed the for the planting of wetlands plant species, thus hiding the material used to construct the lake margins (mostly stone).
Santa Gertrudes Park: Lake – drainage system installation
Lake: Construction of the non-rocky banks
Final stage of the lake’s construction
Construction of the lake’s rocky margins
- Production date: 7/14/1964
- Designers (main authors): FCG – Serviço de Projectos e Obras, NOVAIS, Mário
- Project phase: Do projeto de execução à obra (1963-1969)
- Identifier: PT FCG FCG:SPO-S001-P0016-FOTO00724
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected] and refer the document´s ID