From the Design to the Execution of the Works (1963-1969)
Definitive Solution A – Modelling/Implementation
The analysis of the different phases of the park project [i] reveals that the initial path system proposed, especially in the southern zone of the park, has similarities with that of the Santa Gertrudes Park.
A further study on thesepathswas carried out in 1968 [ii], at a later stage of the process. On September 10, 1969, it was completed.
[ii] Provisional Solution C – Modelling / Deployment
Definitive General Plan with level curves
Definitive General Plan with level curves
Topographic plan of the North east boundaries of Gulbenkian Park
Definitive General Plan I – 1969
Definitive General Plan II – 1969
Tags
Details
- Main authors:
- TELLES, Gonçalo Pereira Ribeiro
- Secondary authors:
- FCG – Serviço de Projectos e Obras*
- Spatial Coverages:
- 1968
- Typology:
- Photography
- Phase:
- From the Design to the Execution of the Works (1963-1969)
- Materials:
- concrete, granite, rock, stone slab