From the Design to the Execution of the Works (1963-1969)
Provisional Solution C – Modelling / Deployment
An analysis of the different stages of the park’s design process [i] reveals that the initial pathway proposed, especially in the South Zone of the park, is similar to the Santa Gertrudes Park pathway system, using many of the same routes.
A further study of pathways took place in 1968 [ii], at a late stage in the process. On 10 September, 1969, it was completed.
[ii] Definitive Solution A – Modelling/Implementation
Definitive General Plan with level curves
Definitive General Plan with level curves
Topographic plan of the North east boundaries of Gulbenkian Park
Definitive General Plan I – 1969
Definitive General Plan II – 1969
Tags
Details
- Main authors:
- BARRETO, António Facco Viana, TELLES, Gonçalo Pereira Ribeiro
- Secondary authors:
- FCG – Serviço de Projectos e Obras*
- Spatial Coverages:
- 1968
- Typology:
- Photography
- Phase:
- From the Design to the Execution of the Works (1963-1969)
- Materials:
- concrete, granite, rock, stone slab