From the Design to the Execution of the Works (1963-1969)
Lake – Sections and Details
The technical solution found for the construction of the lake, with special emphasis on the construction of the banks, reveals the expert technical knowledge of the landscape architects. It was a great innovation in the scale of garden design and construction in Portugal [i].
[i] Lake: Modelling and banks of the old lake
Lake: Modelling of the lake bottom and non-rocky banks
Lake: Construction completed if the islet and soldering of the paving to be submerged
Tags
Details
- Main authors:
- BARRETO, António Facco Viana, TELLES, Gonçalo Pereira Ribeiro
- Secondary authors:
- FCG – Serviço de Projectos e Obras*
- Spatial Coverages:
- 1962
- Typology:
- Photography
- Phase:
- From the Design to the Execution of the Works (1963-1969)
- Materials:
- concrete, drain, gravel, iron, sand
- Identifiers:
- PT FCG FCG:SCT-S006-DES01111
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected]
and refer the document´s ID