From the Design to the Execution of the Works (1963-1969)
Construction completed of the island and soldering of the bottom of the lake
Tags
Details
- Main authors:
- Mário de Oliveira (photographer)
- Spatial Coverages:
- 1963
- Typology:
- Photography
- Phase:
- From the Design to the Execution of the Works (1963-1969)
- Materials:
- concrete, drain, screen, trench, wood
- Identifiers:
- PT FCG FCG:SPO-S001-P0016-FOTO04665
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected]
and refer the document´s ID