From the Design to the Execution of the Works (1963-1969)
Calouste Gulbenkian Park: Construction of the Headquarters structure and the Parking Lot’s roof
Tags
Details
- Main authors:
- FCG – Serviço de Projectos e Obras*, Mário de Oliveira (photographer)
- Spatial Coverages:
- 1966
- Typology:
- Photography
- Phase:
- From the Design to the Execution of the Works (1963-1969)
- Materials:
- concrete, granite, iron, lawn, meadow, rock, stone, wood
- Identifiers:
- PT FCG FCG:SPO-S001-P0001/08/10-FOTO01672
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected]
and refer the document´s ID