From the call to tender to the preliminary draft (1959-1962)

Preliminary Draft – Watering

As early as 1961, a watering scheme was presented in the Preliminary Draft, which would be further developed in the Execution Plan This irrigation scheme would last until 1999 without any major alterations. In 1999, the irrigation system had to be replaced and updated. This replacement motivated a new intervention on the garden, to be carried out by Gonçalo Ribeiro Telles between the years 2000 and 2014. The scheme presented for the irrigation geometry defined two categories of sprinklers, based on the characteristics of the irrigation area, as follows:

Built-in sprinklers, subdivided by pressure (1.5A to 2.5A and 2.5A). These irrigate the flowerpots, coverings, courtyards and lawn areas.

Mobile sprinklers in areas of woodland or dense vegetation cover.

 

Tags


Details

Main authors:
BARRETO, António Facco Viana, TELLES, Gonçalo Pereira Ribeiro
Secondary authors:
FCG – Serviço de Projectos e Obras*
Spatial Coverages:
1961
Typology:
Photography
Phase:
From the call to tender to the preliminary draft (1959-1962)
Materials:
sprinkler
Identifiers:
PT FCG FCG:SCT-S006-DES01108
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected] and refer the document´s ID

Cookies settings

Cookies Selection

This website uses cookies to improve your browsing experience, security, and its website performance. We may also use cookies to share information on social media and to display messages and advertisements personalised to your interests, both on our website and in others.