From the call to tender to the preliminary draft (1959-1962)

Preliminary Draft – Drainage

As early as 1961, a drainage system was presented in the Preliminary Draft, which was to be further developed in the execution plan [i].

Three subsystems were defined, using different techniques according to the characteristics of the area they drained:

– Drainage system in a “blind trench”, under the peripheral circulation.

– Piped drainage system under the areas to the east and south that correspond to the areas defined as the Park, and under part of the protected area to the northeast. 

– Groundwater drainage system on the roof of the parking lot. 

 

[i] Car park roof drainage system

Tags


Details

Main authors:
BARRETO, António Facco Viana, TELLES, Gonçalo Pereira Ribeiro
Secondary authors:
FCG – Serviço de Projectos e Obras*
Spatial Coverages:
1961
Typology:
Photography
Phase:
From the call to tender to the preliminary draft (1959-1962)
Materials:
drain, trench
Identifiers:
PT FCG FCG:SCT-S006-DES01107
In order to consult the original version of this document you should contact the Gulbenkian Archives by e-mail [email protected] and refer the document´s ID

Cookies settings

Cookies Selection

This website uses cookies to improve your browsing experience, security, and its website performance. We may also use cookies to share information on social media and to display messages and advertisements personalised to your interests, both on our website and in others.